Case Studies — hero

Case Studies

Explore built mass timber projects and Nordic Structures case studies — from award-winning civic buildings and hotels to large residential complexes, schools, classrooms and bridges. Each PDF opens in a new tab for easy download and sharing with your design and construction team.

Bill Fisch Forest Centre

York Region, Ontario

Case Study
  • First Ontario building to be fully certified under the Living Building Challenge — the world’s most rigorous standard for building performance.
  • Novel roof design: glulam roof beams located above CLT panels for a clean interior look.
  • Net-positive energy, net-zero water use, FSC certified Nordic CLT and GLT, zero Red List.

Canadian Wood Council, discover more at cwc.ca

Bill Fisch Forest Centre exterior in the forest
Candlewood Suites CLT hotel exterior

Candlewood Suites

Huntsville, Alabama

Case Study
  • Four-storey, 92-unit hotel built using CLT panels for the US Army’s PAL program.
  • A crew of 11 workers, 8 with no carpentry experience, achieved a 44% reduction in work hours and delivered the hotel 37% faster than a typical PAL project.
  • The tight tolerances and energy-conserving nature of CLT panels reduced HVAC requirements while lowering energy consumption by 31% over comparable PAL hotels.
  • Field Sound Transmission Class (FSTC) ratings outperformed theoretical analysis with a 63 rating for walls and 74 at the CLT floors.

Wood Products Council, more at woodworks.org

John W. Olver Design Building

UMass Amherst, Massachusetts

Case Study
  • 8,100 m² building for Architecture, Landscape and Planning faculties at UMass.
  • Floors use HBV shear connectors integrated into 5-ply CLT panels to attach a 100 mm concrete slab.
  • A trapezoidal truss system with wood elements in compression and steel tension rods creates visual drama in the central atrium.

Nordic Structures, explore at nordic.ca

Interior of John W. Olver Design Building with exposed mass timber
Platte Fifteen office building exterior with exposed timber structure

Platte Fifteen

Denver, Colorado

Case Study
  • Utilized a 30’×30’ grid with 3-ply CLT floor panels and a 3” concrete top, supported on a double-beam and purlin GLT system fully exposed to the interior and visible from the street.
  • Cost and market analysis considered over 10 different grid configurations.
  • From the foundation up, mass timber reduced construction timelines by 20%.
  • The exposed timber aesthetic is highly desired by tenants and removes time and cost of many finishes typical for steel and concrete buildings.

Wood Products Council, more at woodworks.org

Arbora

Montreal, Quebec

Case Study

Arbora is located in Griffintown and is the largest complex in the world built from mass timber. The project spans 597,560 square feet and consists of 133 condominiums, 30 townhouses and 272 rental units across three 8-storey buildings, and is LEED Platinum certified.

Arbora mass timber residential complex in Montreal
Origine mass timber residential tower in Quebec City

Origine

Quebec City, Quebec

Case Study

Origine, the tallest wooden building in eastern North America, was constructed within four months from December 2016 to April 2017.

Mass Timber — Schools

Case Study

Nordic Structures nordic.ca

Cover of Nordic Structures Mass Timber Schools portfolio
Cover of Nordic Structures Mass Timber Classrooms portfolio

Mass Timber Classrooms

Case Study

Nordic Structures nordic.ca

Mass Timber Vol. 1

Case Study

Nordic Structures nordic.ca

Cover of Nordic Structures Mass Timber Volume 1 portfolio
Cover of Nordic Structures Mass Timber Volume 2 portfolio

Mass Timber Vol. 2

Case Study

Nordic Structures nordic.ca

Mass Timber Bridges

Case Study

Nordic Structures nordic.ca

Cover of Nordic Structures Mass Timber Bridges portfolio